The right equipment. A clearly defined scope.
[email protected]+90 532 478 7751
Sarp Technical Solutions

How do product supply and site services differ?

Separate equipment delivery from installation, inspection and testing responsibilities at quotation.

Break down the scope

Supply, termination, installation, spooling, inspection and testing are different tasks. Define the provider, deliverable and acceptance criteria for each in writing.

Prepare the site

Access, equipment condition, work permissions and operations planning affect service delivery. Method and timing should not be assumed before site conditions are understood.

Associate each document with its task

Product certificates, installation records and test reports answer different questions. Request documents alongside the relevant task in the quotation.

Explore the relevant product group or share your technical requirements with our team. This is a preparation guide; manufacturer instructions and application-specific review remain essential.

Sources and further reading

Samson Rope — Rope Care; OSHA — Slings

Related content

WhatsAppRequest a call